Constitutional Assault on 47 U.S.C. § 332(c)(7)(B)(iv) (“§ 704(b)”)
A Tripartite Offensive Under the Fifth, First, and Tenth Amendments
To: Client Consortium (Municipal League of Cities, Environmental Health Trust, et al.)
Date: October 18, 2025


Problem: § 704(b) forbids state and local governments from regulating the “placement, construction, and modification” of wireless facilities “on the basis of the environmental effects of radio frequency emissions” if a site meets FCC exposure limits. This is the statute’s operative text. Legal Information Institute

Opening to attack: The D.C. Circuit in Environmental Health Trust v. FCC remanded the FCC’s 2019 reaffirmation of the 1996 RF limits for failure to reasonably address non‑cancer health effects and environmental impacts—a live administrative defect that undermines any safe‑harbor narrative around the current limits. The remand stands; the Commission has not cured it. Justia

Primary engine (Fifth Amendment): Treat high‑intensity, sector‑directed RF fields that predictably cross onto neighboring parcels as a government‑authorized, continuous physical invasion—i.e., a de facto easement—triggering per se compensation under Loretto and Cedar Point, and compensable under Causby/Griggs/Richards even if you proceed in the alternative. Justia Law+4Justia Law+4Supreme Court+4

Flanks (First & Tenth Amendments):

Why the science matters (to takings, not causation): A WHO‑commissioned, peer‑reviewed 2025 animal evidence review found high certainty of evidence for increased gliomas and malignant heart schwannomas in male rats under chronic RF exposure. NTP (2018; updated 2025) states “clear evidence” of malignant heart schwannomas in male rats and some evidence for brain gliomas. Ramazzini (2018) reported a statistically significant increase in male‑rat heart schwannomas under far‑field/base‑station‑like exposures. These are not to prove health liability—they show RF is a material physical force, not a trivial abstraction, strengthening the Causby/Griggs/Richards analogy. National Toxicology Program+1

Venue posture & procedural tailwind: The Ninth Circuit is newly skeptical of FCC procedural overreach: League of California Cities v. FCC (2024) vacated parts of the FCC’s 2020 “upgrade clarifications” as unlawful legislative‑rulemaking, though it left other interpretive pieces intact. Pair this with City of Portland v. FCC (2020) and run de‑novo interpretation post‑Loper Bright. CA9 Court of Appeals+1


Statutory Target & Live Baseline

Text: “No State or local government … may regulate … on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the Commission’s regulations.” 47 U.S.C. § 332(c)(7)(B)(iv). Legal Information Institute

Current posture: EHT v. FCC remanded the FCC’s 2019 order for an inadequate explanation of non‑cancer health and environmental issues, expressly including children, long‑term exposures, modulation/pulsation, and environmental effects. The remand remains unresolved; the Commission’s prior rationale stands under judicial shadow. Justia


I. Fifth Amendment (Primary Claim): The RF Easement as a Per Se Physical Taking

Legal frame. A government‑authorized, continuous, parcel‑specific, physical invasion is per se compensable—whether by hardware (Loretto) or compelled third‑party access (Cedar Point). Intangible‑but‑physical invasions (noise/overflights/smoke) are compensable when direct and substantial (Causby, Griggs, Richards). RF energy is physical (electromagnetic), directed (sector azimuth/tilt/EIRP), measurable (power density/Poynting flux), and predictably crosses boundaries 24/7 when a sector faces a residence. Justia Law+4Justia Law+4Supreme Court+4

Government authorization. The federal scheme (spectrum licenses + RF limits) plus § 704(b)’s preemption disables local health‑based exclusions and underwrites the spillover. Local permits implement that federal structure. (Griggs teaches that government‑enabled flight paths created a compensable easement; same logic here.) Legal Information Institute+1

Distinguish Florida Power. That case addressed price regulation of voluntary pole‑attachment leases, not a compelled physical invasion of a third party’s land. Here, RF emissions invade neighboring parcels irrespective of consent; that is Causby/Griggs/Richards, not Florida Power. Justia Law+3Justia Law+3Justia Law+3

Materiality (why this “invasion” isn’t trivial).

Procedural plan & remedies.

Model allegation (takings): “By licensing [SITE] and, through 47 U.S.C. § 332(c)(7)(B)(iv), disabling health‑based exclusion, defendants have authorized a continuous physical invasion of plaintiffs’ land by directed RF energy, appropriating an RF easement. This is a per se taking under Loretto/Cedar Point, or compensable under Causby/Griggs/Richards for direct, peculiar, and substantial invasion.”


II. First Amendment (As‑Applied): Decision‑criteria Blindfolding in a Limited Public Forum

What survives & what does not. Citizens may speak about health; courts have rejected “gag rule” rhetoric. The Tenth Circuit in Santa Fe Alliance held § 704(b) limits what officials may consider in deciding applications; it does not punish or prohibit speech or petitions. That defeats broad 1A attacks—but it leaves room for as‑applied challenges when the forum’s decision criteria are irrationally distorted by excluding probative factual submissions (e.g., parcel‑specific exposure data) during adjudication. Supreme Court

How to posture it. Limited‑public‑forum rules must be reasonable and viewpoint‑neutral. Where a record contains site‑specific RF field evidence and uncontested engineering showing a directed, high‑field main lobe on bedrooms, a categorical refusal to credit such facts as facts (not “health regulation”) can be framed as unreasonable content‑based exclusion when those same bodies rely freely on aesthetics, spacing, and noise. Support with Sorrell‑style “truthful, non‑misleading” information analysis and the Ninth Circuit’s recognition in CTIA v. Berkeley (preemption later enjoined) that factual RF notices can be constitutional compelled speech in other contexts. Justia Law

Model allegation (1A as‑applied): “As applied to [high‑field siting within 500 ft], § 704(b) excludes truthful, parcel‑specific RF evidence from the adjudicative calculus of a limited public forum, unreasonably distorting fact‑finding and decision criteria.”


III. Tenth Amendment: Murphy’s “Negative Command” and Post‑Chevron Statutory Reading

The ask: Treat § 704(b)’s “may not regulate … on the basis of [RF] environmental effects” as an impermissible negative command that dictates state decision criteria, contravening Murphy v. NCAA. Cellular Phone Taskforce sustained § 704(b) against Tenth Amendment attack as valid preemption, but that predates Murphy’s articulation and relied on Chevron‑tinged deference that Loper Bright has now discarded. Press for de novo statutory reading of § 332(c)(7) and a narrower construction avoiding commandeering problems. Supreme Court+2Justia+2

Candor: Courts have thus far treated § 704(b) as preemption, not commandeering (Cellular Phone Taskforce; City of Portland). Your path is to show why this clause is different: it dictates the reasons a sovereign may employ when exercising retained police powers—precisely the “who sets state policy” concern in Murphy. Use Murphy’s language and federalism logic to argue severance of the clause. Supreme Court+1


Evidence & Engineering Blueprint (Non‑Negotiables)

  1. Authorization file: FCC license(s), local permit, and the § 704(b) preemption clause. Legal Information Institute

  2. Directionality & continuity: Sector azimuth/tilt, H/V patterns, EIRP, propagation overlays to show the main lobe superimposed on façades/bedrooms; 24‑hour calibrated logs tying emissions to this site (ARFCN/PCI).

  3. Impact: Appraisal using overflight‑easement methodology (diminution in value; functional loss of specific rooms).

  4. Science annex (materiality): WHO‑commissioned 2025 review (high certainty for glioma & heart schwannoma); NTP final (clear evidence heart schwannoma; some evidence glioma); Ramazzini (far‑field increase in male‑rat heart schwannomas). National Toxicology Program+1


Fora, Vehicles, and Appellate Vectors


Anticipating Pushback (and your answers)

Objection Your answer Anchor
“No compelled access = no per se taking (Florida Power).” Pole‑rent regulation ≠ compelled physical invasion of third‑party parcels. RF spillover is continuous, directed, and government‑authorized—a Causby/Griggs/Richards easement analogue. Justia Law+3Justia Law+3Justia Law+3
“RF is intangible, not a physical occupation.” Courts compensate noise, overflights, smoke/gases when direct and parcel‑specific. RF is electromagnetic energy—measured, directed, and physically interacting. Justia Law+2Justia Law+2
“If compliant, it’s safe—no taking.” Takings turns on appropriation/invasion, not tort safety. EHT remand also undercuts the premise that sub‑limit exposures are conclusively safe. Justia
“1A fails—people can still talk.” True in the abstract (Santa Fe). Our claim is as‑applied distortion of adjudicative criteria—exclusion of truthful, parcel‑specific facts in a limited forum. Supreme Court
“10A fails—this is preemption.” After Murphy, “thou‑shalt‑not‑use‑this‑reason” looks like a prohibited negative command; after Loper Bright, courts read § 332 de novo. Supreme Court+1

Model Pleading Snippets


Practical 90‑Day Build


Messaging & Legislative Tailwind

RF Easements Demand Pay—Or Local Say.” Takings reframes the fight from disputed toxicology to property rights. Pair courtroom wins with Hill outreach while EHT’s remand remains unresolved; consider riding appropriations/NDAA to strip § 704(b)’s categorical bar. Justia


Key Authorities (quick pins)


Final word

You want zero hedging; here it is: The WHO‑commissioned 2025 review finds “high certainty” for gliomas and heart schwannomas in male rats, and NTP says “clear evidence” for male‑rat malignant heart schwannomas. Those are precise statements from the sources themselves. Use them to show RF is a material, directed, physical invasion—and then win on property law. National Toxicology Program

Source

SAR Information & Resources

Discover RF Safe’s exclusive interactive charts to compare phone radiation levels, explore how children’s exposure differs from adults, and learn practical ways to lower RF exposure. Compare All Phones

Children & RF Exposure

Kids absorb more radiation due to thinner skulls. Learn how to protect them.

See Child Safety Data
Exclusive RF Safe Charts

Compare real-world radiation data in interactive charts found only here at RF Safe.

Explore Charts
Reduce Wi-Fi & Bluetooth

Turning off unused transmitters significantly lowers your exposure.

See the Difference
🍏 Apple

View SAR

📱 Google

View SAR

📲 Samsung

View SAR